The design is shorter
The frame is not drawn again. The structural calculation for the standard span already exists, so the designer checks it and adapts it to the location instead of producing a whole new calculation.
EN 1090-2 EXC3 · Đakovo · all of Croatia
A standard steel hall is built to a frame worked out in advance, instead of sizing the structure from scratch every time. The sections, frame spacing and connection details are known — and so are the tonnage and the production sequence, before the quote is even written.
What actually changes
The frame is not drawn again. The structural calculation for the standard span already exists, so the designer checks it and adapts it to the location instead of producing a whole new calculation.
Once the sections and frame spacing are set, the tonnage is known before the quote. No “it turned out heavier than we thought” afterwards.
A repeatable frame means a known sequence in the workshop: cutting, preparing connections, welding, protection. Fewer unknowns in the production schedule.
An assembly that has already been erected has its details solved — anchoring, haunches, bracing. Improvising on site is what most often breaks a deadline.
Our documented type
This is not a catalogue but one worked-out frame that has been produced and erected. The length changes by adding bays at the same spacing; the span and height are what define it.
The item-by-item breakdown, with masses and the public calculation, is published on the prefabricated halls page. You can compare the sections and their properties on the steel profiles page. If you need a smaller ancillary building next to a house in Croatia — up to 50 m², without a building permit — see our prefabricated garages.
Four questions
Answer four questions and you will see whether your case points to the standard solution or to a custom design. The tool does not replace a designer — it only shows which way the conversation goes.
Is a span of up to 10 m without a central column enough for you?
The span decides first. Up to 10 m the frame is standardised and the mass is known in advance; beyond that the sections grow, and the calculation with them.
Is the floor plan rectangular, with no extensions or cantilevers?
A rectangular floor plan means a repeatable frame. Every extension, cantilever or splayed corner needs its own calculation.
Is the hall without an overhead crane and without heavy suspended equipment?
An overhead crane changes the execution class and the sizing of the columns — that is always a custom design.
Is an eaves height of about 5 m enough?
The height feeds into the wind load and the column length. Greater heights are feasible but fall outside the standard frame.
0 of 4 answered.
What changes in design, lead time and price — and what stays the same — is set out in the article Standard or custom steel hall.
Questions and answers
A standard steel hall is built to a repeatable frame worked out in advance, instead of sizing the structure from scratch for every building. The sections, frame spacing and connection details are known, so the mass of the structure and the production sequence are known before the quote. Modeco's documented type is a 10 × 30 × 5 m hall with IPE 330 columns and IPE 240 rafters with a haunch.
Because the structural calculation of a repeatable frame does not start from zero. The designer checks the existing solution and adapts it to the loads of the location instead of drawing a new frame, and the workshop works to an assembly that has already been produced and erected. What gets shorter is the design and production preparation, not the erection itself.
When the span exceeds the standard one, when the floor plan is not rectangular (extensions, cantilevers, splayed corners), when the hall has an overhead crane or heavy suspended equipment, or when a greater eaves height is needed. In those cases the frame is sized for the specific case — that does not mean more expensive per kilogram, only that the calculation is done specifically.
Yes, and that is common. The length changes by adding bays at the same frame spacing, and openings, doors and the building envelope are chosen independently of the load-bearing structure. Whatever changes the frame itself — span, height, crane — falls outside the standard solution.
Yes. A standard solution shortens the design work but does not change the legal procedure: the level of documentation and permits depends on the building law of the location, the use, the gross floor area and the span — not on whether the frame is standardised. What each level requires is explained on the prefabricated halls page.
Yes. In Đakovo, Modeco produces steel structures in execution class EXC3 to EN 1090-2, with welding to EN ISO 3834-2, as well as trapezoidal sheets and flashings from its own plant, and supplies sandwich panels — one supplier for the load-bearing structure and the envelope.
We will tell you whether the standard solution suits you, how heavy the structure is and what the delivery includes — with clearly separated items.